Precautions Should Be Taken When Constructing Masonry Walls In Minneapolis in the Winter


safety precautions during construction

Precautions need to be taken when constructing masonry walls in Minneapolis in the winter are as follows:

  • The temperature on the work site should be known to the contractor.
  • The unsuitable choice of precaution method will collapse the specific project quality.
  • Today LP gas heaters and blowers are available.
  • Contractors can also choose poly enclosure embedded with scaffolding systems tightly.
  • A heat carrying perforated fabric tube running under scaffolding will be used.
  • Use dry mortar instead of wet during winter season.
  • Mortar setting admixtures or type III (quick setting) cement can also be used.
  • Wind barriers with winds above 15mph and temperatures below 25 degree are required.