Precautions need to be taken when constructing masonry walls in Minneapolis in the winter are as follows:
- The temperature on the work site should be known to the contractor.
- The unsuitable choice of precaution method will collapse the specific project quality.
- Today LP gas heaters and blowers are available.
- Contractors can also choose poly enclosure embedded with scaffolding systems tightly.
- A heat carrying perforated fabric tube running under scaffolding will be used.
- Use dry mortar instead of wet during winter season.
- Mortar setting admixtures or type III (quick setting) cement can also be used.
- Wind barriers with winds above 15mph and temperatures below 25 degree are required.